mirror of
https://github.com/go-gitea/gitea.git
synced 2024-11-25 09:40:56 +08:00
Change the release cycle to match actual situations (#16430)
* Change the release cycle to match actual situations * Update CONTRIBUTING.md Co-authored-by: zeripath <art27@cantab.net> Co-authored-by: Lauris BH <lauris@nix.lv>
This commit is contained in:
parent
e180456983
commit
efeb8e890b
|
@ -3,12 +3,14 @@
|
|||
## Table of Contents
|
||||
|
||||
- [Contribution Guidelines](#contribution-guidelines)
|
||||
- [Table of Contents](#table-of-contents)
|
||||
- [Introduction](#introduction)
|
||||
- [Bug reports](#bug-reports)
|
||||
- [Discuss your design](#discuss-your-design)
|
||||
- [Testing redux](#testing-redux)
|
||||
- [Vendoring](#vendoring)
|
||||
- [Translation](#translation)
|
||||
- [Building Gitea](#building-gitea)
|
||||
- [Code review](#code-review)
|
||||
- [Styleguide](#styleguide)
|
||||
- [Design guideline](#design-guideline)
|
||||
|
@ -226,18 +228,18 @@ We assume in good faith that the information you provide is legally binding.
|
|||
|
||||
We adopted a release schedule to streamline the process of working
|
||||
on, finishing, and issuing releases. The overall goal is to make a
|
||||
minor release every two months, which breaks down into one month of
|
||||
minor release every three or four months, which breaks down into two or three months of
|
||||
general development followed by one month of testing and polishing
|
||||
known as the release freeze. All the feature pull requests should be
|
||||
merged in the first month of one release period. And, during the frozen
|
||||
period, a corresponding release branch is open for fixes backported from
|
||||
master. Release candidates are made during this period for user testing to
|
||||
merged before feature freeze. And, during the frozen period, a corresponding
|
||||
release branch is open for fixes backported from main branch. Release candidates
|
||||
are made during this period for user testing to
|
||||
obtain a final version that is maintained in this branch. A release is
|
||||
maintained by issuing patch releases to only correct critical problems
|
||||
such as crashes or security issues.
|
||||
|
||||
Major release cycles are bimonthly. They always begin on the 25th and end on
|
||||
the 24th (i.e., the 25th of December to February 24th).
|
||||
Major release cycles are seasonal. They always begin on the 25th and end on
|
||||
the 24th (i.e., the 25th of December to March 24th).
|
||||
|
||||
During a development cycle, we may also publish any necessary minor releases
|
||||
for the previous version. For example, if the latest, published release is
|
||||
|
|
Loading…
Reference in New Issue
Block a user